Project Name

Maryland SoccerPlex

General Project Overview

18031 Central Park Circle, Boyds Maryland

Size of system: 

  • 594.32 cW DC
  • 1,292 solar panels

 

Description

Gordian Energy Systems was challenged to build a large solar array at an active fieldhouse that hosts daily activities, including  weekend activities. We had to schedule logistics and construction without disrupting the facility’s events and operations.

The system was completed safely, on time and is reliably reducing the facility’s energy bills.

  • The system was installed on the facility’s metal roof.
  • The facility is a 66,000 sq. ft. fieldhouse and part of a complex with nearly two dozen outdoor fields.
  • The goal was to reduce energy costs, save energy, and promote an environmental commitment.
  • Installation included aluminum racking attached to a metal standing seam roof.